SWIP consultation
Environmental Permitting (England and Wales) Regulations 2016
SI 2016/1154 Regulation 13 and Schedule 5, Paragraph 6
Application for an Environmental Permit to operate an installation at;
SCS Waste, Hangar 3, Rudford Industrial Estate, Ford Road, Ford, West Sussex, BN18 0BD
This is to inform you that we have received the above application for a permit to operate a Schedule 13 Small Waste Incineration Plant for the co-incineration of refuse derived fuel and invite comments on the application.
The application has been placed on the public register held by Arun District Council, and has been placed on the council’s website at the following address: www.arun.gov.uk/swip-consultation
The application can also be inspected free of charge by appointment, during normal office hours at Civic Centre, Maltravers Road, Littlehampton, West Sussex, BN17 5LF.
Issues we can and cannot take account of
We can take account of:
- relevant environmental regulatory requirements and technical standards
- information on local population and sensitive sites
- comments on whether the right process is being used for the activity, for example whether the technology is the right one
- the shape and use of the land around the site in terms of its potential impact, whether that impact is acceptable and what pollution control or abatement may be required
- the impact of noise and odour from traffic on site
- permit conditions by providing information that we have not been made aware of in the application, or by correcting incorrect information in the application (e.g. monitoring and techniques to control pollution)
We cannot take account of:
- issues beyond those in the relevant environmental regulations
- anything outside the remit of the EPR, e.g. the proposed location of the site, which is done by the local authority via land use planning
- whether a site should have a formal designation under Habitats Directive or other conservation legislation
- whether the activity should be allowed or not as a matter of principle
- land use issues when determining a permit application, even if changing the location of the activity would improve its environmental performance
- the impact of noise and odour from traffic travelling to and from the site
- the legally defined process we follow to determine a permit
- the granting of a permit if the operator is able to demonstrate that they can carry out the activity without significant risk to the environment or human health
For further information or questions
If further information is required please contact the team via email SWIP.consultation@arun.gov.uk, by calling 01903 737755 or by post:
Environmental Health, Arun District Council
Arun Civic Centre
Maltravers Road
Littlehampton
West Sussex
BN17 5LF
Consultation documents
- Application Form A(2) permit SIGNED.pdf[pdf] 957KB
- ENV1 Site Location [pdf] 264KB
- ENV2 Site Layout [pdf] 147KB
- ENV3 Site Drainage Plan [pdf] 131KB
- ENV4 Fire Method Statement [pdf] 111KB
- ENV4i Fire Management Plan [pdf] 179KB
- ENV4ii Fire Hydrants Plan [pdf] 150KB
- ENV5 Non-Technical Summary [pdf] 264KB
- ENV6 Planning Statement [pdf] 1MB
- ENV7 Air Quality Assessment [pdf] 3MB
- ENV8 Cumulative Air Quality Statement [pdf] 380KB
- ENV9 Noise Assessment [pdf] 1MB
- ENV10 Noise Assessment Addendum[pdf] 810KB
- ENV11 Flood Map for Planning [pdf] 635KB
- ENV12 Plume Visibility Assessment [pdf] 1MB
- ENV13 RDF analysis 2022 [pdf] 145KB
- ENV14 RDF analysis 2023 [pdf] 228KB
- ENV15 Site Management Working Plan [pdf] 218KB
- ENV16 SWIP Process, Monitoring & Maintenance [pdf] 122KB
- ENV17 EIA Screening Request [pdf] 1MB
- ENV18 EIA Screening Opinion [pdf] 235KB
- ENV19 Environment Agency planning reply [pdf] 112KB
- ENV20i Planning Extra Supporting Statement [pdf] 275KB
- ENV20ii Planning Extra Supporting Statement [pdf] 419KB
- ENV20iii Planning Extra Supporting Statement [pdf] 496KB
- ENV21 Site Operator Transfer Notice [pdf] 106KB
- ENV22 Environment Agency Transfer Letter [pdf] 127KB
- ENV23 CHP schematic layout [pdf] 3MB
- ENV25 Waste Mgmt License [pdf] 1MB
- ENV26 Arundel Env Team reply [pdf] 420KB
- Letter to Arun DC EHO 080324 [docx] 80KB
- Letter to Arun DC EHO 110324[docx] 80KB